{"id":9294,"date":"2026-08-31T15:24:34","date_gmt":"2026-08-31T07:24:34","guid":{"rendered":"https:\/\/www.cnxjcm.com\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/"},"modified":"2026-09-30T16:38:41","modified_gmt":"2026-09-30T08:38:41","slug":"mobile-crane-outrigger-setup-extension-ground-support-leveling","status":"publish","type":"post","link":"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/","title":{"rendered":"Mobile Crane Outrigger Setup: Extension Positions, Ground Support, and Leveling Checks"},"content":{"rendered":"<p>Get the outrigger setup wrong and it doesn&#8217;t matter how good your crane&#8217;s load chart looks on paper \u2014 you&#8217;re either derating capacity you didn&#8217;t need to lose, or you&#8217;re setting up a tip-over waiting to happen. The three things that decide this every single time are extension position (full, mid, or minimum), ground bearing support under each pad, and leveling within tolerance before the boom ever moves. Nail those three and the rest of the lift is just following the chart.<\/p>\n<h2>Why Extension Position Changes Your Capacity Chart Entirely<\/h2>\n<p>Most operators know outriggers need to go out \u2014 fewer understand that the extension position isn&#8217;t a preference, it&#8217;s a completely different load chart. A crane rated for 55 tons at full outrigger extension might only handle 15-18 tons at minimum extension. That&#8217;s not a small derate. It&#8217;s a different machine, capacity-wise.<\/p>\n<p>Rough terrain and truck cranes typically offer 3-4 extension positions: full, 3\/4, mid, and minimum (or \u201cstowed\u201d). Each has its own chart page, and the crane&#8217;s onboard system usually detects position via sensors and locks out the wrong chart automatically. But on older units or in the field with worn sensors, operators sometimes assume full capacity applies regardless of extension \u2014 that assumption has caused more tip-overs than any mechanical failure.<\/p>\n<p>For teams running <a href=\"\/rough-terrain-mobile-crane\/\">rough terrain mobile cranes<\/a> on tight urban or industrial sites, minimum extension is often forced by space constraints. That&#8217;s fine \u2014 as long as you&#8217;re pulling numbers from the correct chart page, not the one you wish applied.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/09\/mobile-crane-outrigger-setup-extension-ground-support-leveling-inline-1.png\" alt=\"Close-up of a crane outrigger beam showing extension position markings\"><figcaption class=\"wp-element-caption\">Close-up of a crane outrigger beam showing extension position markings<\/figcaption><\/figure>\n<h2>Ground Bearing Pressure: The Number Most Crews Skip Entirely<\/h2>\n<p>An outrigger pad can transmit ground pressure north of 40-50 tons per square meter on a fully loaded lift \u2014 enough to punch through unreinforced asphalt or soft backfill without warning. This is the single most overlooked step in outrigger setup: nobody calculates it, they just eyeball the ground and hope.<\/p>\n<h3>Calculating What the Pad Actually Needs<\/h3>\n<p>The rule of thumb: outrigger load (from the load chart) divided by pad contact area gives ground bearing pressure, which then gets compared against the soil&#8217;s bearing capacity. Compacted gravel might handle 15-20 tons\/m\u00b2, soft clay or fill can drop below 5 tons\/m\u00b2. If the math doesn&#8217;t work, you add cribbing \u2014 timber mats, steel plates, or engineered outrigger pads \u2014 to spread the load over a wider area.<\/p>\n<h3>A Real Setup Scenario<\/h3>\n<p>For instance, a crane rental company setting up a 30-ton lift near a recently backfilled trench found their standard 600mm x 600mm pads would have generated pressure well beyond what the disturbed soil could bear. They switched to 1.2m x 1.2m timber mats under each pad, which dropped the bearing pressure to a safe margin \u2014 a five-minute fix that avoided a very expensive sink. This is exactly the kind of detail worth confirming before mobilizing equipment like a <a href=\"\/30-ton-rough-terrain-crane-2\/\">30 ton rough terrain crane<\/a> onto unfamiliar ground.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/09\/mobile-crane-outrigger-setup-extension-ground-support-leveling-inline-2.png\" alt=\"Timber cribbing mats placed under crane outrigger pads for ground support\"><figcaption class=\"wp-element-caption\">Timber cribbing mats placed under crane outrigger pads for ground support<\/figcaption><\/figure>\n<h2>Leveling Tolerance: Why 1 Degree Off Matters More Than You Think<\/h2>\n<p>Most cranes require leveling within 1 degree \u2014 some manufacturers specify tighter, around 0.5 degrees \u2014 measured by a bubble level or electronic inclinometer built into the carrier. That sounds trivial until you realize a 1-degree tilt on a fully extended boom can shift the load&#8217;s effective radius by several centimeters, enough to push a marginal lift outside the chart.<\/p>\n<p>Leveling isn&#8217;t just about avoiding a wobbly cab either. The entire load chart assumes a level machine. Slew the boom over the low side of an unleveled crane and you&#8217;ve effectively increased your load radius without the chart accounting for it \u2014 capacity that looked fine on paper suddenly isn&#8217;t.<\/p>\n<h3>The Correct Leveling Sequence<\/h3>\n<ul>\n<li>Set outriggers on stable, checked ground first \u2014 leveling before ground verification is backwards.<\/li>\n<li>Extend and lock all outrigger beams to the required position for the lift.<\/li>\n<li>Raise outrigger jacks until tires or tracks are fully unloaded (not just touching ground).<\/li>\n<li>Check the level indicator in two perpendicular directions, adjusting individual jacks as needed.<\/li>\n<li>Re-check after boom extension and load application \u2014 steel settles under weight.<\/li>\n<\/ul>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/09\/mobile-crane-outrigger-setup-extension-ground-support-leveling-inline-3.png\" alt=\"Bubble level indicator in a crane cab used to verify leveling during outrigger setup\"><figcaption class=\"wp-element-caption\">Bubble level indicator in a crane cab used to verify leveling during outrigger setup<\/figcaption><\/figure>\n<h2>Outrigger Spread: Symmetrical Isn&#8217;t Always Possible \u2014 Here&#8217;s What to Do<\/h2>\n<p>Textbook setups show all four outriggers at equal, full extension. Real jobsites rarely cooperate. A wall, a trench, or a neighboring structure can block one beam from reaching full spread while the others go out fine.<\/p>\n<p>Asymmetrical setups are allowed on most modern cranes, but the load chart shifts based on the shortest extended beam, not the average. If three outriggers are at full extension and one is at mid, the crane&#8217;s control system (or the operator, on older machines) must apply the mid-extension chart for safety \u2014 because that&#8217;s the weakest support point in the system.<\/p>\n<p>This is where <a href=\"\/50-ton-truck-crane-guide\/\">choosing the right crane tonnage<\/a> for a constrained site pays off. A crane with margin above the minimum required capacity handles an asymmetrical setup without forcing the crew into a razor-thin safety margin.<\/p>\n<h2>Pad Contact and the Problem With Sloped or Uneven Surfaces<\/h2>\n<p>A pad that&#8217;s only touching ground on one edge isn&#8217;t providing full support \u2014 it&#8217;s concentrating the entire load onto a fraction of the pad&#8217;s surface area, multiplying the effective bearing pressure well beyond the calculated figure. This happens constantly on sloped yards, gravel piles, or poorly graded lay-down areas.<\/p>\n<p>The fix isn&#8217;t complicated: pack or shim under the low side until the pad sits flat, or use a wedge-shaped crib block designed for the slope angle. Some crews skip this because it looks close enough \u2014 but \u201cclose enough\u201d on a pad edge can mean 30-40% of the intended contact area, which defeats the entire ground bearing calculation from earlier in the setup.<\/p>\n<h3>Quick Field Check<\/h3>\n<p>Slide a straightedge or level bar under the pad edge before loading. If light passes underneath, the pad isn&#8217;t fully seated \u2014 stop and shim before continuing.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/09\/mobile-crane-outrigger-setup-extension-ground-support-leveling-inline-4.png\" alt=\"Crane outrigger pad shimmed with a wedge block on uneven gravel ground\"><figcaption class=\"wp-element-caption\">Crane outrigger pad shimmed with a wedge block on uneven gravel ground<\/figcaption><\/figure>\n<h2>Setup Sequence for Confined Sites: A Practical Walkthrough<\/h2>\n<p>Urban and industrial retrofit sites rarely offer the luxury of full outrigger spread. Here&#8217;s a realistic sequence a crew might follow when setting up a truck crane in a tight yard between two buildings.<\/p>\n<ul>\n<li><strong>Step 1:<\/strong> Survey the footprint \u2014 measure actual available space against the crane&#8217;s mid and minimum extension charts before positioning the carrier.<\/li>\n<li><strong>Step 2:<\/strong> Confirm ground type and add cribbing preemptively if surface is asphalt over unknown subgrade.<\/li>\n<li><strong>Step 3:<\/strong> Position carrier so the heaviest anticipated lift direction aligns with the longest available outrigger spread.<\/li>\n<li><strong>Step 4:<\/strong> Extend outriggers to the maximum position the site allows \u2014 never assume minimum extension just because space is tight everywhere else.<\/li>\n<li><strong>Step 5:<\/strong> Level, then re-verify with a test lift at reduced load before committing to the full rigging plan.<\/li>\n<\/ul>\n<p>This kind of constrained setup is common with a <a href=\"\/12-ton-crane-truck-for-sale\/\">12 ton crane truck<\/a> working infill construction sites, where every meter of outrigger spread has to be negotiated against fences, utilities, and neighboring foundations.<\/p>\n<h2>When Outriggers Alone Aren&#8217;t Enough: Counterweight and Chart Interaction<\/h2>\n<p>Outrigger setup doesn&#8217;t work in isolation \u2014 it interacts directly with counterweight configuration and boom angle. A crane set up perfectly on outriggers but missing required counterweight will still fail the stability check, because the load chart assumes both variables are correct simultaneously.<\/p>\n<p>This matters most on heavier capacity machines. A <a href=\"\/100-ton-mobile-crane\/\">100 ton mobile crane<\/a> or larger unit often has multiple counterweight configurations tied to specific outrigger extension positions \u2014 meaning the chart you pull depends on both settings together, not either one alone. Crews that only double-check outrigger position while assuming counterweight is \u201cclose enough\u201d are working off an incomplete picture.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A crane&#8217;s lift chart is only as good as its outrigger setup. Here&#8217;s how extension position, ground bearing pressure, and leveling tolerance actually determine how much load you can safely swing \u2014 and why so many capacity complaints trace back to a rigging step, not the machine.<\/p>\n","protected":false},"author":1,"featured_media":9308,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[63],"tags":[177,178,176,179],"class_list":["post-9294","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-crane-ground-bearing-pressure","tag-crane-leveling-tolerance","tag-crane-outrigger-extension-positions","tag-rough-terrain-crane-outriggers"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Mobile Crane Outrigger Setup Guide | cnxjcm<\/title>\n<meta name=\"description\" content=\"Learn correct mobile crane outrigger setup: extension positions, ground support requirements, and leveling checks that protect capacity and safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mobile Crane Outrigger Setup Guide | cnxjcm\" \/>\n<meta property=\"og:description\" content=\"Learn correct mobile crane outrigger setup: extension positions, ground support requirements, and leveling checks that protect capacity and safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/\" \/>\n<meta property=\"og:site_name\" content=\"jiufa\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-31T07:24:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-30T08:38:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/09\/mobile-crane-indoor-factory-blog-cover-1024x768.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Ever\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ever\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/\",\"url\":\"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/\",\"name\":\"Mobile Crane Outrigger Setup Guide | cnxjcm\",\"isPartOf\":{\"@id\":\"https:\/\/www.cnxjcm.com\/ar\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.cnxjcm.com\/ar\/wp-content\/uploads\/2026\/09\/mobile-crane-indoor-factory-blog-cover.png\",\"datePublished\":\"2026-08-31T07:24:34+00:00\",\"dateModified\":\"2026-09-30T08:38:41+00:00\",\"author\":{\"@id\":\"https:\/\/www.cnxjcm.com\/ar\/#\/schema\/person\/0d569feefd22a9886bed27ff0b637fd1\"},\"description\":\"Learn correct mobile crane outrigger setup: extension positions, ground support requirements, and leveling checks that protect capacity and safety.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/#breadcrumb\"},\"inLanguage\":\"ar_AR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar_AR\",\"@id\":\"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/#primaryimage\",\"url\":\"https:\/\/www.cnxjcm.com\/ar\/wp-content\/uploads\/2026\/09\/mobile-crane-indoor-factory-blog-cover.png\",\"contentUrl\":\"https:\/\/www.cnxjcm.com\/ar\/wp-content\/uploads\/2026\/09\/mobile-crane-indoor-factory-blog-cover.png\",\"width\":1448,\"height\":1086},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.cnxjcm.com\/ar\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Blog\",\"item\":\"https:\/\/www.cnxjcm.com\/ar\/category\/blog\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Mobile Crane Outrigger Setup: Extension Positions, Ground Support, and Leveling Checks\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.cnxjcm.com\/ar\/#website\",\"url\":\"https:\/\/www.cnxjcm.com\/ar\/\",\"name\":\"jiufa\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.cnxjcm.com\/ar\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar_AR\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.cnxjcm.com\/ar\/#\/schema\/person\/0d569feefd22a9886bed27ff0b637fd1\",\"name\":\"Ever\",\"sameAs\":[\"https:\/\/http:\/localhost\/xingbao\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Mobile Crane Outrigger Setup Guide | cnxjcm","description":"Learn correct mobile crane outrigger setup: extension positions, ground support requirements, and leveling checks that protect capacity and safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/","og_locale":"ar_AR","og_type":"article","og_title":"Mobile Crane Outrigger Setup Guide | cnxjcm","og_description":"Learn correct mobile crane outrigger setup: extension positions, ground support requirements, and leveling checks that protect capacity and safety.","og_url":"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/","og_site_name":"jiufa","article_published_time":"2026-08-31T07:24:34+00:00","article_modified_time":"2026-09-30T08:38:41+00:00","og_image":[{"width":1024,"height":768,"url":"https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/09\/mobile-crane-indoor-factory-blog-cover-1024x768.png","type":"image\/png"}],"author":"Ever","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ever","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/","url":"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/","name":"Mobile Crane Outrigger Setup Guide | cnxjcm","isPartOf":{"@id":"https:\/\/www.cnxjcm.com\/ar\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/#primaryimage"},"image":{"@id":"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/#primaryimage"},"thumbnailUrl":"https:\/\/www.cnxjcm.com\/ar\/wp-content\/uploads\/2026\/09\/mobile-crane-indoor-factory-blog-cover.png","datePublished":"2026-08-31T07:24:34+00:00","dateModified":"2026-09-30T08:38:41+00:00","author":{"@id":"https:\/\/www.cnxjcm.com\/ar\/#\/schema\/person\/0d569feefd22a9886bed27ff0b637fd1"},"description":"Learn correct mobile crane outrigger setup: extension positions, ground support requirements, and leveling checks that protect capacity and safety.","breadcrumb":{"@id":"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/#breadcrumb"},"inLanguage":"ar_AR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/"]}]},{"@type":"ImageObject","inLanguage":"ar_AR","@id":"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/#primaryimage","url":"https:\/\/www.cnxjcm.com\/ar\/wp-content\/uploads\/2026\/09\/mobile-crane-indoor-factory-blog-cover.png","contentUrl":"https:\/\/www.cnxjcm.com\/ar\/wp-content\/uploads\/2026\/09\/mobile-crane-indoor-factory-blog-cover.png","width":1448,"height":1086},{"@type":"BreadcrumbList","@id":"https:\/\/www.cnxjcm.com\/ar\/mobile-crane-outrigger-setup-extension-ground-support-leveling\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.cnxjcm.com\/ar\/"},{"@type":"ListItem","position":2,"name":"Blog","item":"https:\/\/www.cnxjcm.com\/ar\/category\/blog\/"},{"@type":"ListItem","position":3,"name":"Mobile Crane Outrigger Setup: Extension Positions, Ground Support, and Leveling Checks"}]},{"@type":"WebSite","@id":"https:\/\/www.cnxjcm.com\/ar\/#website","url":"https:\/\/www.cnxjcm.com\/ar\/","name":"jiufa","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.cnxjcm.com\/ar\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar_AR"},{"@type":"Person","@id":"https:\/\/www.cnxjcm.com\/ar\/#\/schema\/person\/0d569feefd22a9886bed27ff0b637fd1","name":"Ever","sameAs":["https:\/\/http:\/localhost\/xingbao"]}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/www.cnxjcm.com\/ar\/wp-json\/wp\/v2\/posts\/9294","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cnxjcm.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cnxjcm.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cnxjcm.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cnxjcm.com\/ar\/wp-json\/wp\/v2\/comments?post=9294"}],"version-history":[{"count":1,"href":"https:\/\/www.cnxjcm.com\/ar\/wp-json\/wp\/v2\/posts\/9294\/revisions"}],"predecessor-version":[{"id":9295,"href":"https:\/\/www.cnxjcm.com\/ar\/wp-json\/wp\/v2\/posts\/9294\/revisions\/9295"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cnxjcm.com\/ar\/wp-json\/wp\/v2\/media\/9308"}],"wp:attachment":[{"href":"https:\/\/www.cnxjcm.com\/ar\/wp-json\/wp\/v2\/media?parent=9294"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cnxjcm.com\/ar\/wp-json\/wp\/v2\/categories?post=9294"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cnxjcm.com\/ar\/wp-json\/wp\/v2\/tags?post=9294"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}