12 ton multifunction pipe layer

Short Description:

XJCM multifunction pipelayer adopts the excavator as chassis, its boom is telescopic, it is with pipe clamping device, its balance weight can move right & left and up & down and it has the following functions: pipe hoisting, pipe clamping, pipe transporting, pipe laying and excavating.


Product Detail

FAQ

Product Tags

NO. Technology specification Values
1 Model DGY12
2 Kerb weight 25T
3 Standard bucket capacity 0.3m3
4 power of engine 133KW
5 rotation speed  2000r/min
6 Slewing speed 11.7r/min
7 Max. travel speed (H/L)  5.2/3.5Km/h
8 Grade-ability  35°
9 Operating type  Hydraulic servo
10 Overall length  10400mm
11 Overall width  3180mm
12 Overall height (top of operator's cab)()  3000mm
13 Min. ground clearance  480mm
14 Turning radius at swing table tail  3100
15 Max. digging height  11000mm
16 Max. Digging radius 10000mm
17 Most suitable OD of pipe for hoisting  813mm
18 Max. length of pipe for hoisting  12m
19 Max. rated lifting load  12T
20 Boom length  7200~11900mm
21 Max. lifting height  12m
22 Qty. of steel wire rope for hoisting  6
23 Diameter of steel wire rope for hoisting  10mm

Load chart of DGY12

Radius (m)

Base Boom length 7200mm

Mid-extend Boom length 9550mm

Full-extend Boom length 11900mm

Lifting load (kg)

Lifting load (kg)

Lifting load (kg)

3

12000

11200

9000

3.5

11800

10400

8550

4

10400

9700

8200

4.5

8900

9100

7400

5

8100

8100

6800

5.5

 

7300

7200

6

 

6450

6200

6.5

 

5700

5900

7

 

 

5500

8

 

 

4600

9

 

 

3900

10

 

 

3300

Notes:  Explanations to Lifting Load

1) The rated lifting load value given in the table is the maximum lifting capacity when the crane is set on solid and level ground. The load should not exceed 75 % of the tip-over load;

2) The total rated lifting load given in the table includes the weight of hook and slings;

3) The working radius given in the table is the actual value including the deformation amount of the boom, so lifting operation should be carried out as per working radius.

4) 75 % of the tip-over load takes into account wind force 6, i.e. lifting operation still can be carried out with fully-extended outriggers when the wind pressure reaches 125N/m2.