{"id":9367,"date":"2026-10-22T16:15:01","date_gmt":"2026-10-22T08:15:01","guid":{"rendered":"https:\/\/www.cnxjcm.com\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/"},"modified":"2026-11-02T10:32:32","modified_gmt":"2026-11-02T02:32:32","slug":"main-hoist-vs-auxiliary-hoist-mobile-cranes","status":"publish","type":"post","link":"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/","title":{"rendered":"Main Hoist vs Auxiliary Hoist on Mobile Cranes: Key Differences"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The main hoist is the high-capacity, slower-speed drum used for heavy single-line or multi-part lifts, while the auxiliary (whip) hoist is a lighter, faster drum used for quick single-line picks, longer reach work, and jib-extended lifts. Most mobile and rough terrain cranes carry both so operators can match line speed and capacity to the job without re-reeving the main line. Get this wrong on a jobsite and you&#8217;re either burning cycle time on light picks or risking an overload trying to stretch the whip line past its rating.<\/p>\n\n\n\n<div class=\"key-takeaways\">\n<p><strong>Key takeaways<\/strong><\/p>\n<ul>\n<li>The main hoist is the larger, multi-part-reeved drum built for capacity and control; the auxiliary (whip) hoist is the smaller, single-part drum built for speed and reach.<\/li>\n<li>Load charts list separate capacity columns for main hoist and auxiliary\/jib configurations, and switching hoists at the same radius can change the rated capacity.<\/li>\n<li>Personnel basket work is typically restricted to the main hoist under most safety codes, while pile driving and repetitive light picks suit the faster auxiliary hoist.<\/li>\n<li>Wire rope specifications are not interchangeable between the two drums; replacement rope must match the original diameter and construction for each hoist.<\/li>\n<\/ul>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">What a Hoist Actually Does on a Mobile Crane<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A hoist is the drum, wire rope, and hydraulic motor assembly that spools rope in and out to raise or lower a load. That&#8217;s it. No boom movement, no slewing, no outrigger function, just vertical lifting. On mobile cranes, this assembly is driven hydraulically rather than electrically or pneumatically, which is the norm on fixed shop or bridge cranes. Hydraulic drive gives smoother load control under variable engine RPM, which matters when a crane is lifting off uneven ground or swinging a load at the same time.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It helps to separate the hoist from the crane itself early on. The crane is the entire machine: carrier, outriggers, boom, superstructure, and the hoist drums mounted on it. The hoist is just one component of that system, the part that actually moves the load up and down.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Why does a single crane carry two separate hoist drums instead of one? Because a single drum, sized for either maximum capacity or maximum speed, can&#8217;t do both jobs well. Build it heavy enough for full-capacity lifts and it&#8217;s slow on light picks. Build it fast for light picks and it can&#8217;t handle the rated load at the base of the chart. Two drums solve that trade-off.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-inline-1.jpg\" alt=\"Hydraulic hoist drum with wire rope on a mobile crane superstructure\"\/><figcaption class=\"wp-element-caption\">Hydraulic hoist drum with wire rope on a mobile crane superstructure<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">What Is the Difference Between a Hoist and a Crane?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A hoist is the vertical lifting component. A crane is the complete machine that also provides horizontal reach through the boom and travel through the carrier. This distinction sounds basic, but it trips up a lot of procurement conversations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When a buyer asks a supplier for \u201choist specs,\u201d they usually mean line pull, drum capacity, and rope speed for a specific drum. When they ask for \u201ccrane specs,\u201d they&#8217;re asking about the whole package: boom length, outrigger footprint, counterweight, and load chart across all radii. Mixing these up in a quote request leads to mismatched expectations. If you&#8217;re comparing a <a href=\"\/rough-terrain-cranes\/\">rough terrain crane<\/a> against a <a href=\"\/hydraulic-mobile-truck-crane\/\">hydraulic mobile truck crane<\/a>, make sure you&#8217;re asking for both sets of numbers, not just one.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Main Hoist: Built for Capacity, Not Speed<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The main hoist exists to move the heaviest loads the crane is rated for, and every design choice reflects that priority. The drum is larger in diameter, the wire rope is thicker, and the whole assembly is built to handle sustained high line pull without excessive wear.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For heavy picks, the main hoist is typically reeved with multiple parts of line, meaning the rope runs through several sheaves on the hook block and boom tip before returning to the drum. More parts of line means more rope supporting the load, which multiplies the effective lifting capacity beyond what a single strand could handle. The tradeoff is line speed: more parts of line means the hook moves slower for every foot of rope the drum takes up.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That slower speed isn&#8217;t a flaw, it&#8217;s the point. Control matters more than speed when you&#8217;re lifting near the crane&#8217;s rated capacity. The main hoist is what shows up at the base of the load chart, the heaviest numbers at the shortest radii, where every inch of movement needs to be deliberate.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-inline-2-1024x576.png\" alt=\"\" class=\"wp-image-9381\" srcset=\"https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-inline-2-1024x576.png 1024w, https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-inline-2-300x169.png 300w, https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-inline-2-768x432.png 768w, https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-inline-2-1536x864.png 1536w, https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-inline-2.png 1672w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Heavy steel beam lifted by a crane main hoist with multi-part rope reeving<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Auxiliary (Whip) Hoist: Built for Speed and Reach<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The auxiliary hoist, often called the whip line, is the mirror image of the main hoist. Smaller drum, thinner wire rope, rated for lighter single-line loads. What it gives up in capacity, it makes up in speed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Because the auxiliary line is almost always reeved single-part, straight off the boom tip or a jib tip, there&#8217;s less drag and fewer rope layers to manage. That translates directly into faster line speed, which matters enormously on jobs with repetitive light picks. Setting roofing panels, moving HVAC units, or handling light material all day? You don&#8217;t want to wait on main-hoist speed for every single cycle.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The auxiliary hoist is also the standard choice when a jib is extended off the main boom. Reach, not capacity, is the priority in that configuration, and the whip line is engineered for exactly that. If you&#8217;re comparing <a href=\"\/blog\/fixed-jib-vs-luffing-jib-mobile-cranes-reach-angle-working-range\/\">fixed jib vs luffing jib<\/a> setups, the auxiliary hoist is almost always the one doing the lifting at the jib tip.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-inline-3-1024x768.png\" alt=\"\" class=\"wp-image-9380\" srcset=\"https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-inline-3-1024x768.png 1024w, https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-inline-3-300x225.png 300w, https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-inline-3-768x576.png 768w, https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-inline-3.png 1448w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Crane jib tip lifting a light load with a single-line auxiliary hoist cable<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Line Pull, Reeving, and Load Chart Implications<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This is where hoist choice stops being academic and starts affecting what you can legally lift. Each drum has a line pull rating, the maximum load the rope can handle in a single part before you need multi-part reeving to spread the load across more rope strands.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Add parts of line to the main hoist and capacity goes up, but hook speed drops. As a rough rule, more parts of line raise capacity roughly in proportion while hook travel speed drops at a similar rate for the same drum rotation, but the actual numbers depend on reeving efficiency, sheave friction, and the specific drum and rope system on that crane. Don&#8217;t treat it as an exact formula; treat it as the direction the trade-off moves in.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Load charts reflect this directly. Most mobile and rough terrain crane charts carry separate capacity columns for main hoist configurations at the boom tip and for auxiliary or jib hoist configurations. These numbers are not interchangeable. Switching from main hoist to auxiliary hoist at the exact same radius can change the rated capacity significantly, because the rope, reeving, and structural point of attachment are all different.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Factor<\/th><th>Main Hoist<\/th><th>Auxiliary Hoist<\/th><\/tr><tr><td>Reeving<\/td><td>Multi-part common<\/td><td>Single-part standard<\/td><\/tr><tr><td>Line speed<\/td><td>Slower<\/td><td>Faster<\/td><\/tr><tr><td>Load chart column<\/td><td>Boom tip capacity<\/td><td>Jib\/auxiliary capacity<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The practical takeaway: never assume one load chart page applies to both hoists. Confirm which column matches the hoist and reeving configuration you&#8217;re actually using before the lift, not after.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">When to Use Main vs Auxiliary Hoist on the Jobsite<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Heavy structural steel or precast picks<\/strong> near rated capacity call for the main hoist with multi-part reeving. There&#8217;s no substitute for that control.<\/li>\n\n\n\n<li><strong>Tandem lifts<\/strong> sometimes split the work: one crane&#8217;s main hoist takes the heavy end of a long load while an auxiliary hoist on the same or a second crane balances a lighter point.<\/li>\n\n\n\n<li><strong>Personnel basket work<\/strong> is normally run on the main hoist. The multi-part reeving gives the redundancy and load margin that personnel lifting calls for, which a single-part auxiliary line generally isn&#8217;t built to provide. Always check the specific standard and local regulation that applies to your jobsite before configuring a personnel lift.<\/li>\n\n\n\n<li><strong>Pile driving or vibratory hammer work<\/strong> often favors the auxiliary hoist, because the faster line speed and single-part reeving suit the repetitive up-down cycling better than a slower main line.<\/li>\n\n\n\n<li><strong>Jib-extended picks<\/strong> for roofing material, rooftop units, or light panels lean on the auxiliary hoist for reach and speed. The main hoist&#8217;s capacity advantage is wasted weight you don&#8217;t need out there.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Imagine a crew setting precast wall panels with the main hoist while a second, lighter fixture pick needs to happen at the jib tip at the same time. That&#8217;s exactly the scenario dual-hoist cranes are built for: one operator, one machine, two independent lifting paths running in parallel instead of waiting on each other.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What to Specify When Ordering a Crane With Auxiliary Hoist<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Confirm the auxiliary hoist&#8217;s line pull and speed rating actually match the jib length and reach application you intend to run, not just a generic spec sheet number.<\/li>\n\n\n\n<li>Check whether the auxiliary hoist is standard equipment or an optional add-on. This affects both lead time and price, and it&#8217;s a common surprise late in procurement if it&#8217;s assumed rather than confirmed.<\/li>\n\n\n\n<li>Verify wire rope diameter and drum capacity are matched to the jib length ordered, not just sized for the main boom. A longer jib with an undersized auxiliary drum is a mismatch that shows up on the first heavy jib pick.<\/li>\n\n\n\n<li>Ask for the load chart pages covering auxiliary hoist and jib configurations specifically, before finalizing the order. Don&#8217;t accept a quote that only shows main boom capacity numbers.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">CNXJCM produces rough terrain cranes from 10 to 160 tons and truck cranes from 12 to 120 tons. Structural parts across these cranes go through double-sided shot blasting, sandblasting, or shot peening to achieve a uniform near-white metal surface before finishing, which matters for long-term corrosion resistance on export jobsites. If you&#8217;re deciding between crane classes, our guide on rough terrain vs all terrain cranes is a useful starting point before you get into hoist specifics.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-inline-4.jpg\" alt=\"Crane structural steel parts after shot blasting showing a near-white metal finish\"\/><figcaption class=\"wp-element-caption\">Crane structural steel parts after shot blasting showing a near-white metal finish<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Maintenance and Wire Rope Differences Between the Two Drums<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Main hoist wire rope sees heavier cyclic loading and needs more frequent inspection for wear at multi-part reeving points, where sheave contact and bending fatigue concentrate stress.<\/li>\n\n\n\n<li>Auxiliary hoist rope carries lighter loads but cycles faster, which means it can log more total spooling cycles over a shift even though each individual load is smaller.<\/li>\n\n\n\n<li>Rope diameter and construction differ between the two drums by design. Replacement rope must match the original specification exactly for each hoist, never swapped from one drum to the other even if the diameters look close.<\/li>\n\n\n\n<li>Drum and sheave alignment checks matter more on the auxiliary hoist when a jib is frequently attached and removed, since repeated reconfiguration is more likely to introduce misalignment than a main boom that stays in one geometry for most of the job.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Getting the Hoist Configuration Right From the Start<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The load chart is what actually decides which hoist applies at a given radius, and that&#8217;s not something to guess at on site. Confusing the two columns, or assuming one chart covers both configurations, is how overloads happen.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Buyers should settle on auxiliary hoist and jib requirements before placing an order, not after delivery. Retrofitting a hoist system or upgrading rope and drum sizing after the fact costs more in downtime and parts than specifying it correctly up front. If your fleet runs jobs that mix heavy structural lifts with lighter, faster-cycling work, a dual-hoist configuration isn&#8217;t a luxury, it&#8217;s the right tool for the job.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">CNXJCM produces RT cranes from 10 to 160 tons and truck cranes from 12 to 120 tons, and exports to more than 40 countries including Africa, the Middle East, Southeast Asia, and the CIS region. With that tonnage range, there&#8217;s room to specify the hoist combination your project actually needs. Reach out to our team before finalizing your next crane order to confirm the right configuration.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Frequently asked questions<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">What is the difference between a hoist and a crane?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A hoist is the drum, wire rope, and motor assembly that does the actual vertical lifting. A crane is the complete machine, including the boom for horizontal reach and the carrier for mobility, with the hoist mounted on it as one component among several.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What is a carry deck crane?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A carry deck crane is a small, compact mobile crane with a rotating boom mounted over a flat deck that can also carry loads on the deck itself while traveling short distances. It&#8217;s typically used for tight indoor or confined-space lifting rather than heavy outdoor construction work.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What is the most stable type of hoist?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For mobile crane applications, a hydraulically driven main hoist with multi-part reeving is the most stable configuration, since spreading the load across several rope strands reduces sway and gives finer control during heavy, near-capacity lifts compared to single-part reeving.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Two drums, two jobs: the main hoist handles heavy capacity lifts while the auxiliary hoist moves faster for reach and jib work. Here&#8217;s how line pull, reeving, and load charts actually change between the two, and what to specify when ordering a crane with both.<\/p>\n","protected":false},"author":1,"featured_media":9382,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[63],"tags":[204,205,206,207],"class_list":["post-9367","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-auxiliary-hoist-mobile-crane","tag-crane-wire-rope-reeving","tag-rough-terrain-crane-load-chart","tag-whip-hoist-crane"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Main Hoist vs Auxiliary Hoist on Mobile Cranes | cnxjcm<\/title>\n<meta name=\"description\" content=\"Main hoist vs auxiliary hoist crane differences explained: line pull, reeving, speed, and load chart impact for rough terrain and truck cranes.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Main Hoist vs Auxiliary Hoist on Mobile Cranes | cnxjcm\" \/>\n<meta property=\"og:description\" content=\"Main hoist vs auxiliary hoist crane differences explained: line pull, reeving, speed, and load chart impact for rough terrain and truck cranes.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/\" \/>\n<meta property=\"og:site_name\" content=\"jiufa\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-22T08:15:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-02T02:32:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-featured-1024x576.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Ever\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ever\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/\",\"url\":\"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/\",\"name\":\"Main Hoist vs Auxiliary Hoist on Mobile Cranes | cnxjcm\",\"isPartOf\":{\"@id\":\"https:\/\/www.cnxjcm.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.cnxjcm.com\/fr\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-featured.png\",\"datePublished\":\"2026-10-22T08:15:01+00:00\",\"dateModified\":\"2026-11-02T02:32:32+00:00\",\"author\":{\"@id\":\"https:\/\/www.cnxjcm.com\/fr\/#\/schema\/person\/0d569feefd22a9886bed27ff0b637fd1\"},\"description\":\"Main hoist vs auxiliary hoist crane differences explained: line pull, reeving, speed, and load chart impact for rough terrain and truck cranes.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/#breadcrumb\"},\"inLanguage\":\"fr_FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr_FR\",\"@id\":\"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/#primaryimage\",\"url\":\"https:\/\/www.cnxjcm.com\/fr\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-featured.png\",\"contentUrl\":\"https:\/\/www.cnxjcm.com\/fr\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-featured.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.cnxjcm.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Blog\",\"item\":\"https:\/\/www.cnxjcm.com\/fr\/category\/blog\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Main Hoist vs Auxiliary Hoist on Mobile Cranes: Key Differences\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.cnxjcm.com\/fr\/#website\",\"url\":\"https:\/\/www.cnxjcm.com\/fr\/\",\"name\":\"jiufa\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.cnxjcm.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr_FR\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.cnxjcm.com\/fr\/#\/schema\/person\/0d569feefd22a9886bed27ff0b637fd1\",\"name\":\"Ever\",\"sameAs\":[\"https:\/\/http:\/localhost\/xingbao\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Main Hoist vs Auxiliary Hoist on Mobile Cranes | cnxjcm","description":"Main hoist vs auxiliary hoist crane differences explained: line pull, reeving, speed, and load chart impact for rough terrain and truck cranes.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/","og_locale":"fr_FR","og_type":"article","og_title":"Main Hoist vs Auxiliary Hoist on Mobile Cranes | cnxjcm","og_description":"Main hoist vs auxiliary hoist crane differences explained: line pull, reeving, speed, and load chart impact for rough terrain and truck cranes.","og_url":"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/","og_site_name":"jiufa","article_published_time":"2026-10-22T08:15:01+00:00","article_modified_time":"2026-11-02T02:32:32+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/www.cnxjcm.com\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-featured-1024x576.png","type":"image\/png"}],"author":"Ever","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ever","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/","url":"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/","name":"Main Hoist vs Auxiliary Hoist on Mobile Cranes | cnxjcm","isPartOf":{"@id":"https:\/\/www.cnxjcm.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/#primaryimage"},"image":{"@id":"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/#primaryimage"},"thumbnailUrl":"https:\/\/www.cnxjcm.com\/fr\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-featured.png","datePublished":"2026-10-22T08:15:01+00:00","dateModified":"2026-11-02T02:32:32+00:00","author":{"@id":"https:\/\/www.cnxjcm.com\/fr\/#\/schema\/person\/0d569feefd22a9886bed27ff0b637fd1"},"description":"Main hoist vs auxiliary hoist crane differences explained: line pull, reeving, speed, and load chart impact for rough terrain and truck cranes.","breadcrumb":{"@id":"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/#breadcrumb"},"inLanguage":"fr_FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/"]}]},{"@type":"ImageObject","inLanguage":"fr_FR","@id":"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/#primaryimage","url":"https:\/\/www.cnxjcm.com\/fr\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-featured.png","contentUrl":"https:\/\/www.cnxjcm.com\/fr\/wp-content\/uploads\/2026\/10\/main-hoist-vs-auxiliary-hoist-mobile-cranes-featured.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/www.cnxjcm.com\/fr\/main-hoist-vs-auxiliary-hoist-mobile-cranes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.cnxjcm.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Blog","item":"https:\/\/www.cnxjcm.com\/fr\/category\/blog\/"},{"@type":"ListItem","position":3,"name":"Main Hoist vs Auxiliary Hoist on Mobile Cranes: Key Differences"}]},{"@type":"WebSite","@id":"https:\/\/www.cnxjcm.com\/fr\/#website","url":"https:\/\/www.cnxjcm.com\/fr\/","name":"jiufa","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.cnxjcm.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr_FR"},{"@type":"Person","@id":"https:\/\/www.cnxjcm.com\/fr\/#\/schema\/person\/0d569feefd22a9886bed27ff0b637fd1","name":"Ever","sameAs":["https:\/\/http:\/localhost\/xingbao"]}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/www.cnxjcm.com\/fr\/wp-json\/wp\/v2\/posts\/9367","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cnxjcm.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cnxjcm.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cnxjcm.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cnxjcm.com\/fr\/wp-json\/wp\/v2\/comments?post=9367"}],"version-history":[{"count":2,"href":"https:\/\/www.cnxjcm.com\/fr\/wp-json\/wp\/v2\/posts\/9367\/revisions"}],"predecessor-version":[{"id":9399,"href":"https:\/\/www.cnxjcm.com\/fr\/wp-json\/wp\/v2\/posts\/9367\/revisions\/9399"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cnxjcm.com\/fr\/wp-json\/wp\/v2\/media\/9382"}],"wp:attachment":[{"href":"https:\/\/www.cnxjcm.com\/fr\/wp-json\/wp\/v2\/media?parent=9367"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cnxjcm.com\/fr\/wp-json\/wp\/v2\/categories?post=9367"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cnxjcm.com\/fr\/wp-json\/wp\/v2\/tags?post=9367"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}